  1. What is the first step in a systematic approach to servicing a UPS?

A) Replace all components

B) Identify the symptoms of the fault

C) Test the output voltage

D) Clean the UPS

Correct Answer: B) Identify the symptoms of the fault

  1. Which of the following is a common fault that can occur in a UPS?

A) Battery failure

B) Inverter malfunction

C) Overheating

D) All of the above

Correct Answer: D) All of the above

  1. When simulating a fault in a UPS for training purposes, what is a safe practice?

A) Disconnect the UPS from the mains power

B) Use a load that exceeds the UPS capacity

C) Bypass safety features

D) None of the above

Correct Answer: A) Disconnect the UPS from the mains power

  1. If a UPS is not providing backup power during an outage, what is the first component to check?

A) The inverter

B) The battery

C) The input voltage

D) The output load

Correct Answer: B) The battery

  1. What tool is essential for diagnosing electrical faults in a UPS?

A) Oscilloscope

B) Multimeter

C) Circuit tracer

D) All of the above

Correct Answer: D) All of the above

 

  1. What should you do if the UPS is overheating?

A) Increase the load

B) Check for proper ventilation and clean the fans

C) Ignore it, as it will cool down

D) Replace the UPS immediately

Correct Answer: B) Check for proper ventilation and clean the fans

  1. Which of the following is a systematic method for troubleshooting a UPS?

A) Trial and error

B) Visual inspection, testing, and component replacement

C) Guessing the faulty component

D) Replacing the entire UPS

Correct Answer: B) Visual inspection, testing, and component replacement

  1. If the UPS is producing a distorted output waveform, what could be a likely cause?

A) Faulty battery

B) Defective inverter

C) Incorrect load

D) All of the above

Correct Answer: B) Defective inverter

  1. What is the purpose of simulating faults during UPS servicing training?

A) To waste time

B) To familiarize technicians with troubleshooting techniques

C) To increase the complexity of servicing

D) To avoid real-world scenarios

Correct Answer: B) To familiarize technicians with troubleshooting techniques

  1. After identifying and rectifying a fault in a UPS, what is the next step?

A) Close the UPS and leave it

B) Test the UPS under load conditions to ensure proper operation

C) Replace all components

D) Document the fault and repair process

Correct Answer: B) Test the UPS under load conditions to ensure proper operation